BAHRAIN has taken yet another step towards embracing green energy by launching a new solar panels project.
It features awarding a 20-year contract for local or international bidders to build, own, operate and manage grid-tied solar photovoltaic (PV) power panels with a minimum capacity of 72MWac in multiple premises in Sakhir, in south of the kingdom .